4.12.2010

Propaganda group, consisting of famous Kazakhstan artists have visited the enterprises in territory of SEZ «Ontustyk»

 From December, 3rd  till December, 21st,  the action, for the purpose of propagation of the Government program of the forced industrially-innovative development of Kazakhstan passes in the country. Propaganda groups, which  consist of  actors of the Kazakhstan platform, famous figures of arts, workers of republican television channel "Kazakhstan" visit all regions of the country.

30.11.2010

Action within the limits of accelerated realization of GPFIID (GPFIIR) for 2010-2014 by NDP “Nur Otan”

 Within the limits of accelerated realization of GPFIID (GPFIIR) for 2010-2014, the action had been moved by representatives of NDP “Nur Otan” on November, 30th m 2010, conference-hall of Directorate SEZ “Ontustyk”.

22.11.2010

Iranian delegations’ visit

 On November, 22nd and 29, 2010 Directorate of SEZ was visited by two Iranian delegations, first of which was headed by Mr. Hussein Bamiri, the Trading Embassy secretary of Islamic Republic Iran in Kazakhstan, and the second delegation consisted of the Iranian businessmen

Adress:

The Republic of Kazakhstan, the South-Kazakhstan oblast, Sairam region, Zhuldyz village, Lenger highway, 7 km

Tel.:

tel.: 8(7252) 249 266
fax: 8(7252) 249 261

Infrastructure

Schedule of infrastructure objects construction in SEZ “Ontustyk”

Companies that carry out the investment projects on the territory of Special economic zone “Ontustyk” are granted all engineering networks including gas, electricity, telephony, sewerage and auto road and railway.
¹ Infrastructure objects Description
Headrace engineering networks
1 Gas utilities Gas pipe line capacity is 124827,1 thousand Hm3, pressure is 2-4 êg/cm2
2 Telephony Automatic telephone system for 250 phone numbers
3 Road and bridge over Badam river Length is 2 km, dual highway
4 Two railways Two railways with dead-ends tracks from Tekesu station, length is 4 km.
5 Electric power substation Electric power substation 220/10 Kw with high voltage line 220 kW, capacity is 90 Mw/hour
6 Water supply and sewerage system Two lines of waterways, diameter - 500 mm, water supply capacity is 50 232 cubic meters per day, sewerage system capacity is 35 000 cubic meters per day
Inside objects, engineering networks and communications
1 Inside engineering networks and communications Inside lines of waterways (necessity per day is 50231,7 ì3, sewerage (total volume of sewage is 34854,3 ì3, inside electric power supply  is provided by electric power substation 220/10 Kw on the territory of SEZ “Ontustyk”, the length is 5 km), telephony (automatic telephone system for 250 phone numbers, the length is 2 km), gas utilities (diameter of gas pipe is 200 mm, total length is 5 km)
2 Additional facilities for customs post Automobile customs post, railway customs post, scale platform, customs examination platform, shed